Argon Piping Supply, Installation and Testing
Argon Piping Supply, Installation and Testing is a published development and funding opportunity on Contexium. The donor or funder is ENERGY, DEPARTMENT OF. Project location(s): United States. Applications close on 27 Jul 2026. As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will th…
Opportunity overview
- Project name
- Argon Piping Supply, Installation and Testing
- Donor
- ENERGY, DEPARTMENT OF
Key details
- Opportunity start date
- Opportunity end date
- Project location(s)
- United States
Summary
Frequently asked questions
What is Argon Piping Supply, Installation and Testing?
Argon Piping Supply, Installation and Testing is a published development and funding opportunity on Contexium. The donor or funder is ENERGY, DEPARTMENT OF. Project location(s): United States. Applications close on 27 Jul 2026. As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will th…
Who is funding Argon Piping Supply, Installation and Testing?
Argon Piping Supply, Installation and Testing is funded by ENERGY, DEPARTMENT OF.
When is the deadline to apply for Argon Piping Supply, Installation and Testing?
The application deadline is 27 Jul 2026 17:00 (UTC).
Where will the Argon Piping Supply, Installation and Testing project take place?
The project location(s) are: United States.
How can I apply for Argon Piping Supply, Installation and Testing?
Create a free Contexium account to view the full opportunity details and submit an application via the marketplace.